Safety helmet dan safety shoes

Thursday, November 12, 2009
 
comments
 
 Edit Post
Kak Sham telefon lagi. Tanya bila boleh hantar quotation. Biasanya kalau Kak Sham minta quote memang terus oder. Safety helmet kuning dgn biru..dan safety shoes..katanya nak deliver ke Bangi dan Nilai..Kuantiti pun memuaskan...beratus-ratus piecessss..huhuhu

 

Plier dan Steel Wire Cutter

 
comments
 
 Edit Post
Suksess..suksess..at least ada oder hari ini. 6k + lain-lain yang belum kira lagi..apa barang?..steel wire cutter dan pliers untuk kegunaan memotong drop wire/cable bearer. Iitem ni aku yang cadangkan agar pekerja perlu ada alat yang "multipurpose used". Plier mesti ada bila buat kerja-kerja maintenance..di rumah pun ramai orang simpan plier, dalam kereta, dan semesti ada dalam tools box..macam-macam boleh guna wooo...










 

Cara-cara OFC Splicing

Wednesday, November 11, 2009
 
comments
 
 Edit Post
 

Hari terakhir kursus di TM TC.

 
comments
 
 Edit Post
Hari ini merupakan "last day" kursus di TM TC. Jalan nak masuk kesana jem pagi ni..Ingatkan pasal apa..cisss..rupanya pasal bas nak keluar simpang..jalan sempit plak tu..warung2 letak kerusi meja di tepi jalan..hampeh betol!
























 

Kursus OFC di TM Training Center

Monday, November 9, 2009
 
comments: 1
 
 Edit Post
Mulai dari hari ini dan selama tiga hari berturut kitorang ada kursus di TM Training Center. Kursus berkenaan cara yang betul untuk menarik cable fibre. Kena tarik dgn berhemah sebab dlm cable ada kaca.
Kena buat figure of "8" dgn diameter selebar 1 meter apabila menarik ke manhole dan dalam jarak yang jauh. walaupun aku tak terlibat menarik dlm "acara" menarik cable ni tapi boleh menambah pengetahuan am aku.

Breakfast, lunch dan tea break disediakan tapi air minum nak komplen sikit...tawar cam kedekut gula jerr..tapi alhamdulillah la tu..

























Tenaga pengajar dari TM ialah Encik Fazli.

 

Senarai barangan Kontraktor Projek HSBB

Sunday, November 8, 2009
 
comments
 
 Edit Post
Item
No

Description


TOOL & TEST GEAR





1
CABLE DRUM TURNTABLE


2
CABLE GRIP SINGLE EYE


3
CABLE PULLEY



4
CABLE CUTTER



5
SWIVEL





6
D-SHACKLE




7
MEASURING WHEEL


8
PORTABLE WATER PUMP


9
PORTABLE GENERATOR


10
MANHOLE KEY





PERSONAL PROTECTIVE EQUIPMENT (PPE)

1
TOP SAFE TS-301 SAFETY SHOES
2
SAFETY WELLINGTON BOOTS

3
PROGUARD ADVANTAGE I SAFETY HELMET
4
REFLECTIVE VEST DOUBLE STRIPES
5
FIRST AID KIT - SMALL


6
BW GAS ALERT MAX CLIP PORTABLE GAS DETECTOR-4 SENSORS; H2S, O2, CO & EX.
7
SAFETY CONE 30" WITH SAND BASE
8
SIGNBOARD "AWAS KERJA TELEKOM DIHADAPAN"
9
BLINKERS LIGHT



10
WARNING TAPE



11
VENTILATOR (BLOWER) C/W HOSE


TOOLS FOR FIBRE OPTIC INSTALLATIONS, SPLICING & TESTING

1 i) FUSION SPLICER-FUJIKURA 60S (SINGLE)

ii) FUSION SPLICER-FUJIKURA 60R (RIBBON)
2
FUJIKURA HIGH PRECISION CLEAVER
3
CABLE TIE (110 mm - 150 mm)

4
MILLER FIBRE STRIPPER


5
PON OPTICAL TIME DOMAIN REFLECTOMETER
NOYES OFL280-102
6
PON OPTICAL POWER METER
NOYES OPM5-3D
7
FIBER INSPECTION PROBE-NOYES VS300
8
PON OLTS (OPTICAL LOSS TEST SET)-EXFO
 

Projek HSBB di Jalan Telawi

 
comments
 
 Edit Post
Pada suatu hari aku dapat mengikut Hisham dan Joe sediakan kabel untuk proses splicing..ada la skit gamba yang boleh aku kongsikan..tengok lah!

Keselamatan diorang utamakan..kan diorang semua da pergi kursus safety di Niosh. Hisham yang banyak buat kerja Joe masih berada di peringkat novice ketika ini..tapi skarang Joe da cekap..dia skarang da lead satu team splicer.


















































































Mesin splicer Fujikura 17R dan fiber cleaver.
 

Office kitorang

 
comments
 
 Edit Post
Disini tempat segala urusan operasi syarikat kami dijalankan dengan kekuatan kakitangan seramai enam orang sahaja..tak termasuk budak-budak yang buat project HSBB

 

Manhole Key-Pengenalan

Friday, November 6, 2009
 
comments: 2
 
 Edit Post
Manhole key


















Twisted T-Pin for Manhole Key